An approved vendor list should answer a practical question: what may this supplier provide, under which conditions, and who can release the order? A company name with an annual review date is not enough when one purchase comes through an authorized channel and another depends on independently sourced stock.
Qualify the business relationship first. Then evaluate the specific ordering code, source route and lot proposed for each purchase. Keep these decisions visible so that a supplier’s general approval cannot silently waive an order-specific requirement.
What should be checked before a component supplier is approved?
Check legal identity, channel status, the scope of supplied products, traceability capability, inspection arrangements and the proposed commercial terms. Verify important claims through their issuer or primary records. Approval should name the allowed purchasing scope and the conditions that trigger additional review.
Manufacturer authorization is one such claim. Consult the manufacturer’s own directory, such as Analog Devices’ sales and distributor directory, for the relevant company, geography and product scope. A logo, line card or inventory listing is not equivalent evidence.
The distinction matters after delivery as well. ADI’s post-sales policy ties manufacturer support and failure-analysis access to purchasing channels. Independently sourced material should not be represented as carrying authorized-channel support merely because it has the same MPN.
Build approval around evidence and limits
Use the following matrix to record a decision, not to create an automatic numerical score. A mandatory requirement can block a purchase even when the other rows are satisfactory.

| Review area | Evidence to request | Decision to record |
|---|---|---|
| Business identity | Legal entity, address, contracting and payment details | Which entity is approved and will invoice the order |
| Channel | Manufacturer authorization where required; otherwise a disclosed independent route | Which source routes are permitted |
| Traceability | Available purchase chain, lot identifiers and quantity reconciliation | Which evidence gaps are acceptable, if any |
| Inspection | Methods, facility or laboratory, sampling, acceptance limits and report scope | Which checks the order requires before release |
| Handling | Packing, storage and moisture/ESD controls applicable to the material | What receiving evidence must accompany the lot |
| Contract | Quoted identity, condition, warranty, remedies, claims window and change rules | What happens if the delivered material differs |
For certifications, verify the issuer, certified legal entity, site, scope and validity. For laboratory capability, distinguish a named method from a demonstrated ability to execute the required test. Neither a general quality certificate nor a long equipment list proves that a specific device can be tested across its required limits.
SAE AS6081A’s published scope concerns source selection and suspect-counterfeit risk in independent distribution. Citing the standard does not establish that a supplier is certified or that a particular order satisfies its requirements.
Use one real requirement to test the quotation process
A controlled quotation review exposes gaps that a generic questionnaire may miss. Choose a representative approved line and check whether the response preserves its identity and requirements.

For example, a precision-reference inquiry should keep the voltage, accuracy grade, package and packing suffix visible. The LTC6655 comparison shows why a shortened family number can be ambiguous. A Cyclone V SX inquiry needs the complete device and package options; an offer for another density is an engineering candidate, not an accepted substitution.
Ask the supplier to identify any deviations explicitly. Does a single-lot request become mixed lots? Is the quantity available in the required carrier? Does an inspection report apply to the offered lot or to a different sample? Are delivery and test costs included? Record the answers beside the quote so the award decision can be reconstructed.
When should a purchase be held or the supplier scope narrowed?
Hold the purchase when a mandatory identity, source, inspection or contractual requirement remains unresolved. Narrow the supplier’s approval when the available evidence supports only a more limited activity, such as sourcing candidates for engineering review rather than providing released production material.
Examples include inconsistent legal or payment details, lot quantities that cannot be reconciled, a certificate outside the relevant scope, an inspection report without a lot reference, or a proposed MPN change hidden in a quote. A missing record is an unresolved item; a contradicted record needs investigation and containment. Do not label every discrepancy as proven counterfeiting.
The lot verification checklist handles the material-level decision. Supplier qualification should define who may accept exceptions and which evidence must be retained, rather than leaving those decisions to an urgent buyer.
Maintain an approval that reflects actual use
Record the approved company, sites, product or service scope, allowed source routes, evidence requirements, review owner and expiry or review triggers. Reassess after a significant legal, site, subcontractor, channel or quality change, and after an unexplained delivery discrepancy.
Use order performance to check whether the approved process is being followed: exact-code accuracy, documentation completeness, lot consistency, communication of changes and resolution of claims. Avoid converting these observations into a claim that the supplier can meet every device or test requirement.
For industrial component sourcing, the purchasing record should connect supplier approval to the released board and incoming-material decision. For a multi-line requirement, the BOM prioritization guide keeps unresolved technical and supply questions visible line by line.
Frequently Asked Questions (FAQ)
Does an ISO certificate prove that a component lot is authentic?
No. A certificate describes a management-system scope and must itself be checked. It does not establish the provenance or authenticity of an individual lot.
Can a supplier stay approved while a particular lot is rejected?
Yes. Supplier approval and lot release are separate decisions. Record the rejection, containment and corrective action, then determine whether the supplier’s approved scope needs to change.
Should the cheapest complete quote always receive the order?
No. Compare technical identity, required evidence, accepted risk, delivery scope and contractual remedies as well as price. A quote that does not meet a mandatory requirement is not equivalent to a compliant one.